Sunday, 6 March 2011
Almost There!!!
This is the second time I have fixed the case and tightened all 36 screws holding the top panel on. The first time was a bit of a disaster. After putting it together I fired it up and after months of working perfectly fine with the top off, the altimeter failed to fire up. I had to take the case apart and the altimeter to see what went wrong. I have a feeling it may go again and run into some calibration problems but...well...we'll see.
Saturday, 12 February 2011
Simkits Turn Coordinator
Saturday, 5 February 2011
Soldering the switches and comms panel
Electrical components


I recently installed the electrical components into the chassis. The Simkits CCU2 board, Simkits 32bit controller, PSU and USB hub are now all in place. I've been testing the Simkits gauges alongside the TRC software and FS004 on a spare computer. They need a bit more tweaking to get them correctly calibrated with the TRC software but I'm happy with them so far. I spoke to Peter at Simkits support to ask about compatibility between old CCU2 gauges and the new USB type. Fortunately he says they will work side by side with no problems. That's a relief since I am still missing a turn coordinator which I need to purchase fairly soon if I want to get this completed.
Tuesday, 25 January 2011
Powder coating completed
Friday, 14 January 2011
Alu panels being powder coated.
Dropped off the aluminium panels to a powder coating company in Cardiff. I will hopefully have them done by Wednesday at the latest. The only worries I have with this process are: if I flex one of the panels too much the coating will crack. The company told me that there was a bit of play with it. The other problem is that the coating adds thickness and the holes for the 3mm screws will get smaller. I have allowed 1mm for this by using a 4mm drill bit on all the holes but if the coating ends up quite thick then I will have to file them down for the screws to fit.
Subscribe to:
Posts (Atom)


